Project Description

Peninsula Pool

Through our on-call contract with Portland Parks & Recreation (PP&R), we documented the existing conditions of the historic Peninsula Park Pool structure including ADA accessibility and structural integrity, and performed a feasibility study for renovations to the pool, pool deck and pool mechanical systems. Convergence led a team of consultants for the feasibility study, including an aquatic consultant, electrical engineer and structural engineer as well as a cost estimator. The report our team developed will be used by PP&R to allocate bond funding for the completion of the project.

» Back to “Our Work”